Hurricane Harvey

In August of 2017, Hurricane Harvey damaged several transmission line structures for Aransas Pass to Port Aransas transmission line.  TTL was engaged to perform geotechnical investigation and provide the engineering recommendations by mid-November of 2017.  Using an unmanned Arial vehicle, our professional staff immediately assessed the site to identify challenges and to formulate a strategy…


AEP Service Center, Corpus Christi, TX

American Electric Power (AEP) is constructing a new state-of-the-art service center in Corpus Christi, Texas, that will replace two AEP facilities in the area. TTL was engaged by AEP to perform a geotechnical exploration and provide engineering recommendations. The facility will be approximately 94,000 square feet and will house 150 employees from various departments including Distribution…


Linde Gas

TTL performed construction materials testing services for this $41 million project for Linde Gas in Adel, Georgia. The project was the largest capital investment in Cook County to date and joined 10 other sites in Georgia with an estimated 570 employees statewide. Linde Group is headquartered in Munich, Germany, and produces and sells atmospheric gases…


South Nashville Natural Gas Pipeline

Construction for this project included a 12 mile, 20-inch diameter pipeline, a 1.5 mile, 12-inch lateral pipeline, three pressure regulation stations, and one pipeline interconnection station for our client, Energy Land & Infrastructure, LLC. Project services included drilling borings in areas with materials susceptible to landslides along planned horizontal directional drilling (HDD) alignments and providing…


BP Facility, Decatur, AL

TTL performed a geotechnical exploration, construction materials testing, and special inspections on the 100,000-square-foot facility in Decatur, AL. Services included soils and concrete sample collection, testing, and analysis. TTL also performed steel inspection.