TTL performed geotechnical services, construction materials testing, and special inspections for this $90 million project set to open August 2019. After two years of construction, the more than 400,000-square-foot high school houses 77 general classrooms, 35 specialty classrooms, and 14 science labs, and will offer 200+ courses for students.
Belmont University
Housing the Belmont University College of Law, the Randall & Sadie Baskin Center contains more than a dozen classrooms, a 21st Century trial courtroom, an appellate courtroom, a two-story law library, and more than 20 faculty offices. It is a 71,000-square-foot building with a 5-story underground parking garage. The key feature of the three-story brick…
First Presbyterian Church & Day School
TTL provided the initial asbestos survey, abatement specification, ongoing project management, and on-site asbestos air monitoring services for the First Presbyterian Church in Victoria, Texas. This project posed different risks due to the fact that the sanctuary included 30-foot ceilings and a balcony with walls and ceiling materials that tested positive for asbestos and required…
Columbia State Community College
During the early stages of design, TTL was called upon to perform a geotechnical exploration at the site to evaluate the subsurface conditions and provide earthwork, pavement, and foundation recommendations. The exploration revealed the site is located in a heavily karstic area, meaning it is prone to sinkholes and other voids at or below the…